• HomeSolutionMotorcycle

      Project Introduction:

      The project adopts 26 load-bearing assembled AGVs and 18 latent traction AGVs to realize the automatic circulation of vehicle assembly and SPS material distribution in a motorcycle enterprise, and to meet the annual production capacity of 60,000 two-wheeled large-displacement motorcycles. The production site is highly efficient and standardized.

        

      Return to list
      在線客服
      2020亚洲人妻中文,东京热一区二区久久综合,又紧又爽又深精品视频一区二区,av无码一区二区